Monday, November 25, 2013

Working from the Boat - Day Job


People often ask me if I am retired, or how I can live on a boat while working.  The reality is that if you have the type of job that doesn't require you to be in 1 spot, this is a very workable solution.  In my case, I travel often to customer sites and to see employees and prospects.  If you do any kind of traveling for work, you have likely already adapted to being able to work remotely.  For example, I have found I can be fairly productive while at an airport, a hotel, or even while realaxing and enjoying a meal out.  

When I am home (on our boat) that also means that I can work and be productive there as well.  The boat has a Navigation Station like most sailboats (Think Mini office without the doors).  In my case, this consists of a monitor that is mounted in the center of the Nav Station that both doubles as an extra monitor for my laptop when I am working, or the heart of navigation and computing for the boat itself.  



In the picture in the sidebar, you can see that my desk is as messy as most desks you see in someone’s office.  Sadly in my case, it is also filled with a pair of sailing gloves, some line, a bunch of wires for the electronics like the router and my headset.

To make hearing and speaking to people, I have a pair of pretty good headphones to use on my cell phone or my laptop whether I am taking a call on my cell phone, or Voice over IP software such as Skype.  They are noise canceling which comes in handy when the wind is howling through the rigging above.  (See video clip a little later to see why this can come in so handy)

When Deb is not on board and I am working, I will use the large LED TV in the Salon as my monitor and sit on the salon settee.  It is a bit more comfortable and I like the extra real estate for the screen.     This was the case last week as I was sitting in the salon working.  It was a great day because it was still warm but overcast so no bright sunlight for a change, I had the hatches all opened up and had a nice gentle breeze running through the boat.  Half way through the call the wind started to pick up, then it started to pick up a lot, and I could hear the howling in the distance as the wind blew through the rigging of the row of sailboats just upwind of me.  While on the call, I muted my microphone and closed the large forward hatch.  As I finished that the sky opened up with a torrential rain pour.  I was quickly closing the 4 hatches in the roof that I had open and another 7 opening ports on the side of the boat.  All of this was going on while I was still on this conference call and un-muting the microphone to respond to a question or comment then muting as quickly as I could again.  

By the time the call ended, the wind was blowing a steady 20 knots and gusting to about 30.  The rain subsided for the most part and when I went back up top, the temperature felt like it dropped 15 degrees in that hour.

I continued to work the rest of the day on meetings and phone calls remotely, however the wind really had the boat hobby horsing and rocking pretty good.  When the wind starts to blow that hard, there are a few interesting sounds that happen on the boat, that we are just used to, but others wonder what they are.  I attached a small video below that shows me sitting on the salon settee working.  You can get a sense for how much motion there was on the boat this day, and we were tied up to a dock.  If you listen closely you can hear a few things in the background.  The first is the wind that you can still hear howling if you listen carefully.  This is with all of the hatches battened down and closed up tight.  You will also hear a bit of a ringing sound or long dull clank.   This sound is actually made from two different things that run up the inside of the mast.  There are wires that run from the base of the mast to the top of the mast for lighting on top of the mast, antenna, etc.  This is combined with the lines that run up the mast for raising the sails.  When the boat rocks a certain way they hit on the inside of the mast making this sound.    The other is a loud thump , this is actually something that you should not hear, but I still had an antenna for the TV run up on the flag halyard and when the wind would blow it hit the stays (the metal wires that run from the sides of the boat to the top of the mast to stabilize it).  It is a lot like a giant piano or guitar string being plucked.

So there you have it, a little insight into working from the boat.  98% of the time, it isn't much different than working from your office, but on some days the office is bouncing around a bit.  

Sunday, September 22, 2013

Preventative Maintenance (Engine Room)

We are planning a small cruise from from Houston to Corpus Christi and in preparation for that, I was doing maintenance in the engine room prior to the trip.  This started with the simple stuff

  • Change Oil and Oil  Filter
  • Fill and Check Transmission fluid
  • Run the engine with a load to just validate everything is good to go for a trip
Timing was great, because I found my preferred oil on sale for $12.99 per gallon.  Since we have a 50 Horsepower Perkins 4-108 diesel, I like the heavy duty oil made for diesels.  Shell Rotella T is the brand I use.  Given it was on sale, I went ahead and picked up 2 gallons.  
I also keep a good supply of WIX oil filters for this engine on hand.  I bought a dozen of them 2 years ago.
One of the things I like about having an engine room (and not just a compartment the size of the engine) is the ability to store spare parts and have a little bit of room to work when needed.   I keep a small wire shelf on the rear wall of the engine room that has spare parts and required tools close at hand at all times. 

This is certainly not a complete supply of all of our spares and parts, but these are some of the things I like to keep very handy and nearby the area they will be needed.  The top shelf (not shown in this picture) contains 3 different funnels; small oil funnel, large funnel with flexible hose and a diesel filtering funnel.  

Maintenance supplies in Engine Room
The next shelf down has a small battery tester (you can see the red bulb on the syringe.  It is a glass tube that can determine the quality of each cell of a lead acid flooded battery.
To the right of that is a kitchen spatula that stays in the engine room.  It is used to clean the inside of the site glass of our water strainers (Engine, Air conditioner, shower, etc)  To the right of that is a spare Fuel lift pump in the event we ever need to replace it.   The WIX box is the oil filter and I always keep 2 on the shelf.  You will notice there is only 1 here as I just used one today and have not put the other spare on the shelf.  I also store 2 plastic bags (to the left of the fuel pump) these can be used in a pinch to capture all of the oil when removing the filter and keep any from going into the bilge (See attached video for explanation).  To the right of the filter behind the exhaust riser, there is also an oil filter wrench.

The next shelf down contains two diesel fuel filters and o-rings.  Additionally I have my antifreeze tester there as well.  For those who are really observant and want to know why there is a shot glass also on that shelf, I would love to give you a cute little answer about needing a shot each time I work on the engine, but actually we put a dollop of Kanberra Gel in that about once a month to help keep odors down in the engine room.  

One of the great things that the Previous Owner (PO) has done on this boat is install a permanently mounted oil removal pump.  To "draining" the oil is as easy as running the engine to temperature so that the oil is nice and warm, then opening the oil fill cap, and putting the end of the small hose in a gallon jug and pushing the button.  That's it.  This little pump will pump all of the oil from the drain pan into the jug.   Great little tool and one of my favorite "makes life easier" tools.  Once empty, I changed the oil filter as well.  I have to thank Mike O'Barr for showing me this great little trick for removing the oil filter and keeping oil out of the bilge.  He showed me this on my last boat, and I certainly have carried it forward on this one.  I fold up a few paper towels, or a "puppy pad" under neath the oil filter. I then use the oil filter wrench and loosen up the filter until I can turn it by hand.  Then I take a 1 gallon zip lock back and slide it over the filter and the filter housing, holding the opening of the bag as high as possible.  Then it is just a matter of spinning the filter off it's post.  The oil drips in the bag, once off, I pick up the paper towels underneath and wipe off any oil sitting on the filter housing and drop them into the ziplock.  Zip it up and viola, the oil, filter and oily towels are all in that nice little package.  

I then topped off the transmission fluid.  I have a Borg Warner Velvet Drive transmission in this boat and it can use just about any transmission fluid that meets the Perkins standards (which are most of them).  

I also took the time to treat the water in the holding tanks and install new cartridges in the whole boat water filtration system we built earlier this year.  I added a sediment filter (5 micron) as well as a 1 micron Coconut shell carbon block filter.   The first stage removes any debris, sand, dirt, etc that may be in the water, the next one, removes any chlorine, bleach or other chemicals that may give the water an undesirable taste.  


Saturday, August 10, 2013

Maintaining the Water strainers - How to and what not to do

I have been saying for about 2 weeks that I need to clean the water strainer.  We used to clean them about every 4-6 weeks.  When we moved aboard, the air conditioners were running much more often than when we were not, meaning these filters were seeing a lot more circulation than ever before.  I suspect in the 5 weeks or so since we have been living on board, we likely ran as much water through the air conditioners as we had the entire previous year of just weekend use.

I had been putting it off knowing it was going to be a bit of a nasty job.  Today I decided that since I was going to do it, I would make a video of how to maintain them.  In this video I go through the steps to clean them, however waiting this long is an example of what not to do.  I can already tell that the flow is not back to what it was a month ago, which means I am going to have to flush all of the lines.  This is not going to be a simple job unfortunately.  I will likely buy a flushing kit that has a way to ensure you can put in a solution to all of the lines to break down all of that nasty growth that will be in there.

I have always had some goopy silt that gets in the water strainer in this location but this time it really felt like the texture of a jelly fish or congealed fat in the strainer bowl.

Well here is a video of how to clean it, but this stuff was pretty nasty.




Saturday, June 29, 2013

Continuing to complete the little tasks...

It seems that the major tasks that needed to be done before moving onto the boat are done.  There are a lot of little ones and today was one of those days filled with little tasks.  Deb was taking care of some final prep on storage areas before putting pots, pans, food, and storage bins in all of the little hidey holes that will become our the equivalent to a house "pantry"
Here is some video of Deb doing the work on this task.  She actually does a LOT of the work on the boat and helps with most projects but sadly she is usually the one filming so you rarely see her 'doing' the work.

In addition to this today, we were also able to get a third coat of varnish on all of the new teak cabinets
in the Salon.  In the picture to the right, you can see that we still have all of the cushions out of the salon so we don't get any varnish on them.
Salon starting to come together
With those missing, it seems so disheveled.  Today, I was also doing some work under the companion way steps, so you see those leaned up against the mast in this photo.  The cabinet doors are all inside getting varnished as well and I am hoping by early next week they will all be installed.

Things Deb completed today.

  • Loaded pots and pans for the boat
  • Organized several air tight containers (Lock & Lock are the brand we really like) in the pantry behind the stove. 
  • Started to put some condiments into the refrigerator (Ketchup, mayo, salad dressings, etc)
  • Finished organizing all of the screws from our projects (which we had in about 40 small plastic cups)  She sorted and tossed any flat head screws, and kept all bronze and stainless screws.  We threw away all zinc ones due to the possibility of corroding on the boat in the salt air.  
Things I was able to complete today.
  • Installed House Battery (Big ass 8D battery) into the new battery box with tie downs in the engine room (With a stroke of genius, I was able to use the companion way stairs and a couple of dowels to roll the battery from the walkthrough up onto the new shelves in the engine room without having to lift the 75lb battery while contorting my body in the engine room)
  • Rerouted the large battery cables for the starting battery, house battery and both charging banks
  • Cleaned and services both batteries
  • Installed molding under rear stateroom door frame and around shower
  • Put engine room door back on as well as forward engine access panel that has been out for months
  • Another coat of varnish on the cabinet doors (insides this time)

Tuesday, June 11, 2013

DC Distribution Panel

In the last couple of weeks we installed the new electric head in the aft stateroom and also the new Technautics Cool Blue compressor for the refrigerator and freezer.  When we got ready to install the head, I had to find a proper breaker location for it.  Originally I was hoping I could just tap into the 12 volt lighting circuit in the head.

As I read the instructions, it called for a 20amp circuit, so I ran the correct gauge wire to the distribution panel and used a breaker that was not being used for anything else.

Over the years since 1978 when the boat was built, much of the labeling on the wires from the breaker to the distribution bus have come off and some new wiring was not labeled.  I took the time to sketch out the back of the panel and then trace all of the wires from the 12Volt battery selector to the positive bus bars to the breaker to the distribution bus.  Like most things as we have worked on this project, if it was not documented, then we have created and saved the documents into a new Boat Book to capture all wiring, plumbing, networking and any other diagram that I may need later when working on, or enhancing the boat.
The next step is to add the Refrigerator/Freezer to their own dedicated breaker as well.  It will end up being breaker 9 because the windlass is actually on it's own high amperage switch that must be activated from the engine room.  (Due to the high amperage required when pulling up many feet of chain with the windlass, it was made it a point to not run the windlass unless the engine is running and replenishing the batteries)

The next step will be to create a similar schematic for each of the different AC panels.  The reality is I likely won't do it until I need to rewire something on the AC side of the panel.  So maybe it will be within the year when we end up replacing the rear air conditioner with one that doesn't sound like a freight train.

Monday, May 13, 2013

Plumbing Project Continued (Joining it all together)

In the last post we talked about the new plumbing project that we were undertaking but could only take that project so far until the engine room was ready to connect it all together.

Part of the work that was going on in the engine room (and in a different post detailing that project) was to install holding tanks for waste water.  To do this, the old floors and platforms that had some rot in them had to be replaced.  A new floor was built, frame for the tanks, tanks installed and a new subfloor on top of those was created providing a new platform to mount the batteries, pumps hot water, heater, etc.

Early on during this project we wanted to make sure we had a way to filter water for use in our boat.  We have seen other boats that would put a canister style filter in the galley on the main sink cold water supply to ensure drinking and cooking water is filtered.

We decided to to create a 2 stage filter that will filter all water whether it has come in from a dockside pressure line or water from either of our two water holding tanks on board.  (We store 115 gallons of potable water on board in 2 tanks)  Because there may be times that we take rain water into the tanks, we wanted to be sure that we can filter it completely.    The first stage filter is a 5 micron sediment filter and the second stage is a 2 micron carbon block filter.  This not only filters the water from impurities, but the carbon block will remove any bleach that we may add to the tanks to purify any suspect water we may take in.



With the engine room complete enough to get back in there, we have been able to put the fresh water pressure pump in, the hot water heater, and start to combine all of the water lines that are replacing all of the old PVC flexible hosing that was starting to break down.

The picture on the right shows a small shelf I installed to mount the new fresh water pump to.  This pump is a variable speed pump that eliminates the need for an accumulator tank.  Above the shelf there is a wooden plate mounted over the soundproofing material (1-1.5" thick soundproofing covers all walls in the engine room)  This wooden panel will be the place to mount the manifolds to distribute the lines to the different portions of the boat.

I was able to find these extendable diffuser connections.  Basically it looks like a tee with PEX connectors on 2 sides and the 3rd side fits into one of the other tees.  The more you push together the more connection points there are, and it would be real easy to add an additional port for a future expansion.

One of the things we liked about PEX was that all lines can be color coded making the designation between hot and cold obvious.  In the picture on the left, I had connected cold water supplies to both the Galley/Front Head and also the Rear Head.  On the left side the hot water connections are made to also go to the Galley/Front Head and also the Rear Head.

I started with these lines mainly because when we ran the pex, I had left quite a bit of extra in the engine room and it was rather cluttered with every one of those lines having an additional 4-5 feet of line in the way.  I knew I bought more than I needed so I was ok wasting a bit to make sure we had plenty in there until we knew exactly where we were mounting it all.

You can see a bit of the finished connection points in the photo to the right.

Before this project there were flexible hoses and hose clamps and tees all over the place and it looked like a real mess.  I am glad to see this organized like it is in the picture on the right. Now with that said, I can tell you that as I have been planning and imaging this project, I had envisioned all of these really straight lines all mounted flush right up along each bulkhead and corner.  That would have been great, but as it was I think we spent about $250 on tees and 90 degree connections.  If we had done this the way I envisioned we could have easily tripled that, so I am satisfied with this and it looks MUCH better than before.

I also started to remove the connections from the old hot water heater and noticed that it had a horrible oder in the water inside the tank.  It smelled like sulfur and we had noticed this prior to starting this project as well.  In the end, we decided that if we were going to look at replacing the hot water heater now was the time.  We considered an on-demand style but after doing the calculations quickly realized that even the smallest load required would be 20amps at 120 volts.  This would translate to no less than 2400 amp hours and more than I would be able to supply with the current inverter and I like the idea of being able to make hot water in a bind by running the engine for 10 minutes or so.  We have mounted the hot water heater and ran the cold and hot water lines to this location.  This model does come with the ability to circulate the engine coolant water through the hot water heater to generate hot water without electricity, but sadly the hot water lines from the engine won't reach this new location for the hot water heater so will need to be replaced with longer ones.







Saturday, April 20, 2013

New Plumbing Lines installed


It appears back in 1978 when the boat was built, some of the water lines that were run were 1/4 copper tubing. At some point in the past one of the previous owners replaced that copper plumbing with reinforced hose. The down side is that there had been many places where it was run in small runs and then joined together or sections replaced and joined to the old.

 The results were a spaghetti twined mess in most cases with plastic Tee's and hose clamps. In the engine room there were 3 or 4 Tee's as things were added over the years and it just appeared to be a bit unmanageable. While cleaning in the engine room we decided to scrub the hoses and as we did noticed they were "gummy" When doing some research what I found out is that the "gummy" feeling was the material starting to break down.

Under Galley
This was the birth of a new project. Run new water lines for all fresh/pressure water throughout the boat, clean up and organize the plumbing runs and add water filtration to not only filter what is stored in the tanks but also the standard city water input when at a Marina. We started by running new hot and cold water lines from the engine room to the galley. We welcomed this change because someone in the past ran the 2 Flexible hoses for water along the floor in the galley (Rather than under a floor or through a compartment).

 From the Galley, we ran the new lines forward under the sole to the forward port hanging locker. From there we chose a new route over the previous one by going from section to section up to the V-Berth, across the v-berth and back down the starboard side into the forward head under the sink. We also ran hot and cold lines from the engine room to the rear head as well. In the rear head we added tee's and cutoffs so we could feed hot and cold water to the sink as well as the shower. We also added a fresh cold water line extension to provide water to the rear head rather than pumping in from a through hull.

We chose to instal Pex lines rather than the flexible hosing that was in the boat before.  After doing some research and finding out that many new boats are being made with Pex, we decided to give it a try.  In every place where the lines go through a bulked we installed a PVC protective sleeve to protect the Pex from any wearing with movement.   We also supported all Pex with clips (as seen in the picture above as well).  Pex lines are now run to the Galley and both heads. We still have to bring it all together in the engine room and connect it to the hot water heater and filters.    Like most projects, we created a map of what we intended to install so that we can keep it for reference and with the boat documentation.  Below is the diagram of the fresh water plumbing.

Saturday, April 13, 2013

What happens during spare time on board

Deb and I have been working hard to get everything wrapped up on schedule for moving aboard in June.  We have a lot of projects that are all under way right now.  The rear head is being completely rebuilt (new counters, sink, support walls, toilet and plumbing).  The engine room is getting a make over as well.  Most all has been removed from the engine room short of the engine (all pumps, batteries, hot water heater, etc).  We are actually hiring someone to help with installing holding tanks, 36 gallons between 2 tanks.  As part of this process, they removed the upper floor in the engine room and will be building a new sub floor for the tanks, tank frames and a shelf 16" higher than the subfloor.   We are hoping that will be done sometime this week.   We have taken advantage of the open space in the engine room to install new plumbing and reframe the flooring where a generator will go at some point.   We pulled out the lower floor and are adding support studs to help reinforce it.  We have added new supports and also made new floor planks out of Red Oak.  We have drilled for countersunk screws.  It is epoxied to seal the wood and protect it from moisture.  Those will be going back on board tomorrow.

We have installed the new Teak cabinet faces on the Starboard side as well.  Today we cleaned the outside of the boat and scrubbed the windows in the cockpit.  As we were looking for routes and ways to run new plumbing lines for both hot and cold water to the forward head, we had the floor panels out over the fuel tank and around the mast.  While we didn't find a great path to pass the water lines, Deb did get distracted by the nastiness of the bilge.
She put on a pair of rubber gloves and pulled about 6 handfuls of what looked like mud.  As she scraped the floor in the forward bilge we realized that the previous owner had a problem with the forward shower drain pump and rather than fix it, he just yanked the drain line out and let the forward shower drain into the bilge.  So god only knows how many years of soap scum and nastiness has worked it's way down the shower drain and into the bilge.

I know we all want to think of anchoring off a white sand beach and chilling on deck with a coldie, but these are some of the other not so glorious sides of working and refitting a boat.  
.

Saturday, February 2, 2013

Stateroom Coming Together

About 3 months ago we started the Salon refit.  Early into the demolition we found that the Chain Plates were leaking and started to worry about their strength given they are 35 years old.  As you can read in an earlier post, we replaced them.  Once complete we slowed down through the holidays while traveling and are back at the work again.  

So far, we have removed the salon cabinets (behind the settee), Built new seat backs in the Salon, Built new countertops behind the settee's.  We removed the Atkins & Hoyle hatch that was leaking around the glass and sent it back to the manufacturer for rebuilding.  (I would recommend this to anyone that has Atkins and Hoyle hatches.  They are still in business and family owned.  A complete rebuild with new glass, gasket and overall tune up was 1/2 the price of a new hatch and matches all the others on the boat).  We build new Teak walls behind the Settee's as well as along the coachroof.  We painted all of the inner settee storage with a nice new coat of white paint.

Insulated the entire ceiling with 3/4" insulation and installed the Pine Slat ceiling like in the rest of the boat.  This went on the ceiling, including the angled section that goes on to the Galley.  We installed the new duct work and new register boots in the Salon in preparation for the new Reverse Cycle A/C Heating unit that we will install.  

The salon was wired first for LED accent lighting, fans, reading lights as well as surround sound speaker wires.  I know that I won't likely remember the locations of each of the wires so made a quick video to outline where they are run.


One of the challenges we had was that when we made the new counter tops, we had a need to get creative on how we wanted to protect and decorate the raw edge of it.  We wanted to install a fiddle rail, much like what is in the galley.  The down side is that I couldn't find any place where I could buy fiddle or bunk rail that was over 5' long and I didn't want to have a joint in the middle of the counter.  So, like we have found ourselves doing many times in the past, we had to figure out another way.  We purchased raw teak wood at 1/2" thickness.  After ripping it to 2 and a half inches wide, we routed a groove in the bottom, used a round-over bit to ensure that the top of the rail is round.  I think they look pretty good and will be installed shortly.  We ended up making 2 8 foot lengths of this fiddle rail and another 5 8 foot lengths of thin trim molding to go around the cabinet facing that we are building for the salon.

Sunday, December 2, 2012

LED Multi-Use Lighting for the Owners Stateroom

We have been considering putting accent lighting in the Owners Stateroom since we completed the refit there last year.  I ended up purchasing some LED light strips that were single color and waterproof at a local electronic component store to install in the boats breaker box.  I never did install them but it started the expansion of our ideas for the stateroom.

LED lighting is available at West Marine but it is very expensive and not as versatile as what you can order online.  I reviewed the specs for the LED strips from West, and the ones I can find on Amazon seemed to be fairly similar in that they were the bright LED style strips and waterproof, but the ones from Amazon were also able to be cut to any length and could be set to change colors if desired.

Link to Amazon RGB LED Lights

Thin Cedar Strips mounted
We chose Cedar as the mounting surface for the pleasant smell, resistance to moisture and lastly it was an inexpensive but good way to accomplish the task.  I bought a single 8 foot cedar fence picket and 3 8 foot lengths of scalloped moulding to put the LED's behind.  We got these from home depot.

We cut thin strips of the cedar wood and drilled thin pilot holes through it every 18 inches or so.  We then drilled a small countersink hole at each one so that when mounted to the walls, the screws would be flush.

These particular LED lights came with a 120V AC to 12V DC adapter included in the kit which allowed me to toss that and wire these directly into the boat's 12v DC system.  When we did the refit in the stateroom, we planned to add lights later so already had wiring into each of the 4 corners of the room.
LED's mounted to cedar strips

When installing these lights, we installed the small electronic component, and Infra Red Remote receiver into the corner of the stateroom (where later we will install a small shelving unit with power in it to charge cell phones and Ipad's and store eyeglasses when sleeping).

Once the wiring was connected to the connector for the LED's we mounted the LED strips to the cedar strips facing down.  These particular LED's come with a 3M adhesive backing but I don't suspect that will hold up in the varied temperatures on the boat.  We are adding some epoxy glue to the back side as well to ensure they stay put.

The scalloped molding was also cut to the proper length, had pilot holes drilled, as well as counter sinks allowing us to install and fill the screw holes with bungs after the fact.    Every time in the past we had installed anything that was wood on the boat, we have used a good hardwood (either Teak or Mahogany) but in this case we chose to use a simple pine molding and stain it to the color we wanted.
All my wiring tools
(meter, shrink wrap, marine crimps), etc

After staining the pieces, we applied multiple coats of varnish like the rest of our interior projects.  Once dry we installed these pieces of molding to the cedar strips with the top of the molding flush with the top of the cedar strip so that it creates a void aiming downward for the lights to shine down without being able to see them directly.

We are happy with the way the LED's have turned out and will also be doing something similar in the Salon as we wrap up that part of the refit as well.   The good news is that the entire strip of LED's in the stateroom (about 16 feet of them) still draws minimal amps and are better than the 2 double filament fixtures that were back there before we started the refit.  It is a pleasant surprise to turn on all of the boats LED lighting throughout and watching the DC Ammeter barely move.

Below is a short video we did showing what the lights look like in operation.  We filmed them with the lights changing colors but I don't see us using it that way, I suspect that we will just have a single color when they are on.





Saturday, December 1, 2012

Rigging upgrades

As Deb and I got mid way through our Salon refit we noticed that the chain plates were leaking.  The research we did speaking to other Gulfstar owners as well as others that had boats of this vintage was that the chain plates likely need to be replaced.  If we were going to be trying to repair the leaks by rebedding them, we may as well have them replaced when we do.
I was a bit suprised at the cost for Chain plates to be made, but it is not like you can just call up your local store and order them, so you end up having a fabricator make you new ones using the old ones as patterns.

With all the travel I have been doing, Deb stayed here and worked with the Rigger to have these replaced.    He started by removing the port side lower shrouds and unbolting the chainplates from the hull.  Over time they had been sealed, caulked and who knows what else had been done in the last 30 years to try to keep water from running down the stainless steel chain plates and into the boat.  To get them out, he would connect the halyard to them and then use the winch to apply some upward pressure.  Here you can see the port side coming out.  Remember they go through the toe rail (about 3 and half inches of wood), then through the hull to deck joint which is a layer of the hull sides that is folded over and also a flange on the deck of similar thickness.  On our Gulfstar the hull is solid fiberglass lay-up and when we measured where the bolts went through it was 15/16" thick.  Just a tad shy of an inch.  

As of this posting, there are 3 of the 6 replaced, Monday he is coming back to install the 4th and removing the final 2 that are holding the upper mast supports.  He will take them to the fabricator and I expect we will have them back Tuesday or Wednesday.

As he has been removing them, Deb has been epoxying any small hairline cracks in the toe rail.  In one case the toe rail was split about 1-2 inches on both the fore and aft side of the chain plate opening.  I was so impressed with her first epoxy job.  She mixed it up, injected it down into the crack with a syringe and then clamped the toe rail tight.

After a good rain, we noticed that they were still leaking a bit (horrible disappointment after spending all of that money).  When we asked the rigger about it, he suggested we try pouring water on the deck to see if they are leaking from where the chain plate comes up through the toe rail or if water is seeping under the toe rail and then finding an exit in the chainplate hole.  Well based on our test we think it was the later and had nothing to do with the quality of work by the rigger.

So back to the boat today with heat gun in hand.  We cleaned all of the silicone that was there from a previous attempt to stop the leak, and ensured it was all gone.  We then mixed epoxy in a small syringe and injected it in the tiny crack between the toe rail and deck.  It was kind of like calking with a tip the size of a needle.  It seemed like it was working very well as it was being laid down and even seeped a little more generously into the areas that had a noticeably bigger gap.

Our Mast Head
(Anemometer, anchor light, vhf antenna and windex)
Since the rigger was going to be here, we opted to take care of several other things that were on our list to get done.  So the list is.

  • Rear Backstay replaced (had a small crimp in 1 of the 19 strands of stainless steel)
  • New VHF antenna mounted on mast head (not sure what happened to the old one, I noticed a couple of months ago that just the base was there, the antenna itself was gone)
  • New Deck light bulb installed (heck if he was going to be up there, lets get it all done)
  • Had him add an additional block at the top of the mast for a 3rd halyard (it will be nice to have a backup halyard in the event of a failure, rigging issues or even a backup line for a bosuns chair.)
  • Deb was cool and surprised me with new Halyards for the Main and Jib while he was here.  The old ones were losing their "flexibility"
  • 2 new flag halyards on each spreader for proper quarantine flag flyings, burgees, etc.
  • Lastly a complete rigging inspection (all looked good)
New Main Halyard (New England Spectra Line)

It has certainly been a productive week and will be a productive next month or so.  We will be going back in with all of the salon rebuild as soon as the chainplates are back in and the hatch is installed.  (We have to know all the leaks are taken care of before we put the wooden walls back in place).  We have also got smart about ensuring that we are building access panels to all of these as well through cabinets, walls, etc.

In the last week we have also been getting everything lined up to finalize the salon and galley refit.    We have placed our order for a new 16K BTU reverse cycle air conditioner and heater for the salon.  This in addition to the 12K BTU unit for the rear stateroom should be more than enough for our warm days when living aboard.  The great news is that as long as we don't sail in sub 40 degree water, we can use the same units to heat the boat.   It was out of stock so hoping we have it in the next few weeks.

She looks small from 50 feet up
(You can see our welcome aboard matt on the dock)
The hatch that was leaking was sent back to the manufacturer (nice to see they are still family owned and in business) and being rebuilt and having new glass installed.  Our Gulfstar has all heavy duty Atkins & Hoyle opening/reversing hatches and I spoke to Brian Atkins about doing the work.  It is currently curing and will be coming back next week.

We are also really excited about our new refrigerator/freezer unit.  When we were at a boat show last year we looked at, and really liked, the Cool Blue 12v low draw units with large holding plates.  It was pricy and our unit worked so we just made a mental note and loved the idea of only drawing 24 amps of power in a day.  When I dripped water into our cold machine circuit board, she decided not to run again.  Instead of fixing it (which would have been about 20% of the cost of new unit) we decided to just go ahead and get the best unit for living aboard.    When installed it will give us a complete freezer compartment and a separate refrigerator.  It comes with a 13" X 21" holding plate that is 2 1/2" thick.  The holding plate allows the unit to cool the fluid in that stainless still plate and hold that cold temperature much longer reducing the number of times the compressor has to cycle on and off.  We will end up modifying the opening to our top opening unit to allow better access to the side that we will make the freezer but more on that project when we install it.

Below are a few pictures from atop the mast.  I just through the view was cool so figured I would post them here on the blog as well.
Atop the mast facing North
Watergate Marina starts at the boat house
Atop the mast facing South
Legend Point Marina/Condos in view

Sunday, September 23, 2012

NOT what you want to find in the middle of the job

The work on the Salon continues and we have removed the rest of all cabinetry.  2 opening ports have been removed as has one of the hatches in the roof that was leaking.

Removing the hatch took several hours to break the aluminum frame from the rise as well as breaking the riser loose from the actual deck.  Both had to be removed to inspect the core where the leak was.  We do have softened core in a small section along the opening, it is being removed and filled with a thickened epoxy.

The deck around the openings have all been cleaned and all silicone and adhesive removed.  Acetone worked well along with some 3M pads and razor blades for removing the material.

Image loading, if you are on a slow connection, please wait a momentAll of that was going according to plan, what was not going according to plan was noticing down below that water was slowly coming in along the forward port chainplate.  (The Chainplates are what attach to the hull and then the Standing Rigging, the wire that holds up the mast, is attached to).

After further inspection, I can see that at some point in time, this chain plate had some type of service done to it.  The wooden toe rail that the chainplate goes through, has been cut and then patched back in.  (Below in the image, the blue arrows point to the spot where the toe rail had been cut to gain access to the chainplate.  The red arrows point to the spot that the water is getting into.  I noticed when pouring just a couple of ounces of water on the deck in front of that patched part of the toe rail, some of it is running in.)   I could likely just run a bead of silicone along the joint between the toe rail and the deck, but I suspect that if this has been leaking for a while, I really want to see what is going on in there where that patch is.  This is one of the benefits of having the boat down to bear hull.  I would have never seen this otherwise and in the end, it is not a lot of water coming in, but a little bit every day would cause serious damage.  Now I know why I am having to replace the wooden countertop in the Salon, I suspected a leaking port, but I don't think that is the bigger problem here.
Image loading, if you are on a slow connection, please wait a moment
The strange thing is that it was not raining, this leak became evident just from the dew that was on the deck and starting to pool along the edge of the patched part of the toe rail.  Needless to say, I will be removing the patch and inspecting this closer.  This is a delay I certainly did not anticipate.

I am starting to see why I have heard that when starting a boat project, estimate the time line and the cost accurately and realistically, then double the cost and triple the time and you will be about right for the job.  That has certainly proven to be the case in most of our ventures so far.  :)  Ahhh boat ownership.    I joke, but really wouldn't trade it for the world.


Wednesday, September 12, 2012

The Salon Remodel begins

This is an old post from September of 2012, I just noticed that it remained in draft mode and was not published according to it's schedule

Now that we have wrapped up the Navigation Station, Galley and Walkthrough, we had friends in town and did some nice sailing, now it is back to the next bit of work on the boat.

So yesterday it started, cushions removed, everything removed from the storage below the settee, cupboards emptied and the demolition begins.


Connection sped may be slowing down the process of displaying this image.
Salon - Port Side - Before
In the "Before" picture you can see both Red and Blue arrows.  The blue arrows point to places where we have noticed water coming in when it rains hard.  The odd thing about a boat is where you see it dripping from is typically nowhere near where it is actually leaking.  In this case most of the dripping was coming out of the florescent light fixture mounted on the ceiling behind the settee.  
The leak actually appears to be coming from 2 places.  One is from a poorly bedded opening hatch about 6 feet from that location.  The other culprit appears to be the opening port just above the light itself.  

The red arrows point to all of the areas where the wood will need to be replaced.  This falls into 2 categories.  The peeling veneer on the back wall is rather easy, typically it is just a thin 1/8" thick piece of veneered plywood as a decorative piece.  The flat top of that counter behind the cushion is a little bit more complex and is 3/4 inch teak veneered plywood and helps to provide structure and strength to the boat by locking the galley and Vbert bulkheads together.  

That is the countertop that the cupboards are mounted to, it is also the top of the storage area behind the seat back and houses the air conditioning vents for the Salon area.  

Salon - Port Side - Wood removed
We removed the cupboards, removed the decorative veneer wall from behind it.  Removed the face of the storage area (Also the back of the salon seats) and then removed the horizontal piece that was rotting. 

As we typically do, we have taken these wooden pieces to our storage unit where we will sand the moulding and all of the good pieces of wood down to fresh wood with 220 grit sandpaper.  For the pieces that are rotted, we will use the old ones as patterns and make new ones.  

The big decision now is if we will put it back the way it was, or try to improve upon the storage that the boat has, and we will likely need when living aboard.  I think we will be doing the later and likely will make new cabinets that are deeper than the previous ones.  We will also work to create dividers and doors across the entire countertop so that we have storage all the way across.  By doing these 2 things, we should more than triple the amount of storage that was above the counter on the Port side of the boat.

The hole in the bottom of the seat is the access panel to the 16,500 BTU air conditioning unit that will be installed as soon as the leaking ports have been repaired.  

The realization hit both of us today, it is amazing that in just 2 day of working  (about 7 hours total) we have gutted this section of the boat again down to bare hull and fibreglass in areas.   It will take us 3 months to build all the new stuff and install it again.  And as we all know Murphy's law (I am convinced he was a sailor) kicked in and it started to rain today and will for the next 3 days when I really need to remove and rebed 2 opening ports and 2 opening hatches in the roof.

We did a small video showing what it looks like in more detail now that we have removed the old "stuff"




Monday, September 3, 2012

Sailing Galveston Bay in a Thunder Storm

This Labor Day weekend some of our friends came down to visit and we decided to celebrate the progress made on our refit work down below with a nice sail out on Galveston Bay.  We picked up some sandwiches from Subway and packed some drinks.  (The boat still doesn't have our galley stocked from all the work we were doing just before this trip)

We left the dock in Clear Lake TX and headed east out into Galveston Bay.  The wind was 12-18 knots or so and we had a really nice sail under full main and reefed head sail.  We were nicely making 5-7 knots or so and the sun was shining and it was great visiting and hanging with friends.  As we reached about 4 miles out into Galveston Bay and approached the Houston Shipping Channel, we could see the storm building pretty good to the west behind us.

Checking the radar showed that the storm approaching wasn't that bad, but there was another building that had stronger cells and lightning so we decided to turn back and head back toward it and toward our home port.

As we approached the start of the Channel Markers near Kemah, I saw a power boat trucking out toward the bay at a pretty good clip.  Deciding that I would prefer to ride it out just outside the channel where it was still deep enough was a pretty easy decision.  We just circled a quarter mile area or so watching for other boats that may be doing the same thing.  I did see another sail boat also hunkered down doing the same thing not too far away.

As the rain let up, and visibility started to improve we were able to easily see the channel and head on back.

In the end, we had a great sail.  Everyone got wet, but we were able to confirm that nobody melted.  The return to the slip and subsequent backing into our slip was near perfection if I do say so myself.

The best part of all of this is that one of our friends was taking video's on her iPhone to send to her daughter.  I used those clips to put together this quick summary of the day.



Now, for Deb and I, it is going to be back to tearing up the Salon as that is the next portion of the boat to be refit.