Starting to organize and Clean

The galley has been a mess for 6 months now.  It has turned into a great place to store things and has been the most logical "workbench" in the boat.  I have cut, sanded, carved, planed, sanded, epoxied, hammered and cursed at the surface of the galley counters and the epoxied piece of wood that I keep over one side of the sink for additional "Workbench" space.

Today I had one of those reminders on how this project has really shown Deb and I how well we work together most of the time.  It is not uncommon that she anticipates what I am working on and if I need that 'extra hand' or the next tool, she is right there with it.  It is one of those things I didn't even realize at first.  The seed was planted by my Dad during one of his visits last April.  Deb and I were working on some project (I don't even recall what it was now) but we had it set-up in our storage shed.  As we were working on whatever it was, my my dad commented that we work well together and everything seems planned or synchronized.   At the time, I just took it as a passing comment and thought, "yep, we do" and went on about our project.

A few weeks later, I was working on something when Deb was not around and I realized how much "back and forth" I was doing to get some tool off he shelf and then put it back, when I was done with the jig saw, I rolled the cable up, put it away and dragged out the vacuum.  When Deb and I are working on the project, I set the tool down and move to the next task and it gets miraculously put away neatly.  When cutting wood by myself, I was using clamps and pushing the wood up against the lathe to keep it from sliding as I made cuts.  These are the little things I didn't notice at first.
Yes, We Do Make A Good Team.  More importantly, Deb makes a great team-mate.

With that supportive and intuitive notion, Deb has also realized that I am getting a bit worn out on this refit.  I am ready to have part of the boat back into a usable state.  Something I can go down to and feel proud and enjoy it when I am there.  It was getting to the point where every time I went down below decks on the boat, I came back with a list of things that needed to get done.  It was starting to get frustrating.  This week, Deb has been getting things "setup".  For example in the rear head, she brought towels, toothbrush, soap, shampoo, deodorant, shaving supplies and all of the things needed to shower and make it usable.

Today, she cleaned up my "work bench" and organized the galley.  It is not complete like it will be when we move aboard, but I can get to the cups, and there is some food in the cupboards and some cold drinks in the fridge.  
The navigation station has been the sorting table for screws and small parts (smaller than a quarter) for the last 2 weeks and finding half used boxes or bags of screws everywhere.  Most all of the screws have been sorted by size, stainless or non, put into compartmentalized storage bins and tucked away in some little nook or cranny.  When that is cleared off completely, it will be a wonderful feeling.

Ok, I must confess, I am typing this blog sitting in the salon on a folded old towel because all of the cushions are out of the room preparing for varnish.  I looked up at the nav station and started to giggle a bit.  It is a disaster, I had to take a picture and just give you some insight into what a mess it is right now.  I think this is going to be the thing that Deb and I will struggle most with when living aboard.  No room to leave "stuff" out.  If you need something, dig it out of it's hidey hole and when done, put it all back.  The put it all back part is going to take some getting used to. :)



Tuesday, June 11, 2013

DC Distribution Panel

In the last couple of weeks we installed the new electric head in the aft stateroom and also the new Technautics Cool Blue compressor for the refrigerator and freezer.  When we got ready to install the head, I had to find a proper breaker location for it.  Originally I was hoping I could just tap into the 12 volt lighting circuit in the head.

As I read the instructions, it called for a 20amp circuit, so I ran the correct gauge wire to the distribution panel and used a breaker that was not being used for anything else.

Over the years since 1978 when the boat was built, much of the labeling on the wires from the breaker to the distribution bus have come off and some new wiring was not labeled.  I took the time to sketch out the back of the panel and then trace all of the wires from the 12Volt battery selector to the positive bus bars to the breaker to the distribution bus.  Like most things as we have worked on this project, if it was not documented, then we have created and saved the documents into a new Boat Book to capture all wiring, plumbing, networking and any other diagram that I may need later when working on, or enhancing the boat.
The next step is to add the Refrigerator/Freezer to their own dedicated breaker as well.  It will end up being breaker 9 because the windlass is actually on it's own high amperage switch that must be activated from the engine room.  (Due to the high amperage required when pulling up many feet of chain with the windlass, it was made it a point to not run the windlass unless the engine is running and replenishing the batteries)

The next step will be to create a similar schematic for each of the different AC panels.  The reality is I likely won't do it until I need to rewire something on the AC side of the panel.  So maybe it will be within the year when we end up replacing the rear air conditioner with one that doesn't sound like a freight train.

Tuesday, June 4, 2013

Refrigeration - Yeah

Now that the newest shelves are installed in the engine room, I was able to connect the Technautics Cool Blue low amp DC refrigeration system.  I mounted the cold plate quite some time ago (came with a 2 and a half inch thick cold plate so it will retain that cold for a while without having to cycle the compressor.

Cool Blue compressor is on top right of shelf
This may be one of the simplest units to install.  Once you have the cold plate mounted and the 2 freon tubes run to the location where the compressor will be, it is just a matter of connecting them and tightening to the specified foot pounds (10 in this case).  We mounted the thermostat in the refrigerator and ran the wires to the engine room where the compressor is located through the same path that the freon tubes were run.


After connecting the freon tubes, it is a matter of just connecting 4 wires, 2 for the thermostat and DC Positive and Negative.  In my case, I had to run the wire for it since we located the compressor in a different location than where the old one was.  This wire was easily run in the existing wire channels in the engine room to the distribution panel where it has it's own 20amp circuit.  The previous owner had the old unit connected directly to the battery and not through the panel or on a fuse or circuit.

The Technautics Cool Blue allows for variable speed compressor settings and has some smart controls that will actually have the compressor run at a lower RPM as the batteries begin to get low.

The good news is that I put a gallon of water in there and had nice ice cold water to drink so it is working good.   :)

As a next step, I will end up building a new top loading door for the refrigerator box so that it matches the rest of the counter tops we installed and allows for access either to the Freezer or Refrigerator without having to open both like it is now.