Saturday, February 2, 2013

Stateroom Coming Together

About 3 months ago we started the Salon refit.  Early into the demolition we found that the Chain Plates were leaking and started to worry about their strength given they are 35 years old.  As you can read in an earlier post, we replaced them.  Once complete we slowed down through the holidays while traveling and are back at the work again.  

So far, we have removed the salon cabinets (behind the settee), Built new seat backs in the Salon, Built new countertops behind the settee's.  We removed the Atkins & Hoyle hatch that was leaking around the glass and sent it back to the manufacturer for rebuilding.  (I would recommend this to anyone that has Atkins and Hoyle hatches.  They are still in business and family owned.  A complete rebuild with new glass, gasket and overall tune up was 1/2 the price of a new hatch and matches all the others on the boat).  We build new Teak walls behind the Settee's as well as along the coachroof.  We painted all of the inner settee storage with a nice new coat of white paint.

Insulated the entire ceiling with 3/4" insulation and installed the Pine Slat ceiling like in the rest of the boat.  This went on the ceiling, including the angled section that goes on to the Galley.  We installed the new duct work and new register boots in the Salon in preparation for the new Reverse Cycle A/C Heating unit that we will install.  

The salon was wired first for LED accent lighting, fans, reading lights as well as surround sound speaker wires.  I know that I won't likely remember the locations of each of the wires so made a quick video to outline where they are run.


One of the challenges we had was that when we made the new counter tops, we had a need to get creative on how we wanted to protect and decorate the raw edge of it.  We wanted to install a fiddle rail, much like what is in the galley.  The down side is that I couldn't find any place where I could buy fiddle or bunk rail that was over 5' long and I didn't want to have a joint in the middle of the counter.  So, like we have found ourselves doing many times in the past, we had to figure out another way.  We purchased raw teak wood at 1/2" thickness.  After ripping it to 2 and a half inches wide, we routed a groove in the bottom, used a round-over bit to ensure that the top of the rail is round.  I think they look pretty good and will be installed shortly.  We ended up making 2 8 foot lengths of this fiddle rail and another 5 8 foot lengths of thin trim molding to go around the cabinet facing that we are building for the salon.

Saturday, December 1, 2012

Rigging upgrades

As Deb and I got mid way through our Salon refit we noticed that the chain plates were leaking.  The research we did speaking to other Gulfstar owners as well as others that had boats of this vintage was that the chain plates likely need to be replaced.  If we were going to be trying to repair the leaks by rebedding them, we may as well have them replaced when we do.
I was a bit suprised at the cost for Chain plates to be made, but it is not like you can just call up your local store and order them, so you end up having a fabricator make you new ones using the old ones as patterns.

With all the travel I have been doing, Deb stayed here and worked with the Rigger to have these replaced.    He started by removing the port side lower shrouds and unbolting the chainplates from the hull.  Over time they had been sealed, caulked and who knows what else had been done in the last 30 years to try to keep water from running down the stainless steel chain plates and into the boat.  To get them out, he would connect the halyard to them and then use the winch to apply some upward pressure.  Here you can see the port side coming out.  Remember they go through the toe rail (about 3 and half inches of wood), then through the hull to deck joint which is a layer of the hull sides that is folded over and also a flange on the deck of similar thickness.  On our Gulfstar the hull is solid fiberglass lay-up and when we measured where the bolts went through it was 15/16" thick.  Just a tad shy of an inch.  

As of this posting, there are 3 of the 6 replaced, Monday he is coming back to install the 4th and removing the final 2 that are holding the upper mast supports.  He will take them to the fabricator and I expect we will have them back Tuesday or Wednesday.

As he has been removing them, Deb has been epoxying any small hairline cracks in the toe rail.  In one case the toe rail was split about 1-2 inches on both the fore and aft side of the chain plate opening.  I was so impressed with her first epoxy job.  She mixed it up, injected it down into the crack with a syringe and then clamped the toe rail tight.

After a good rain, we noticed that they were still leaking a bit (horrible disappointment after spending all of that money).  When we asked the rigger about it, he suggested we try pouring water on the deck to see if they are leaking from where the chain plate comes up through the toe rail or if water is seeping under the toe rail and then finding an exit in the chainplate hole.  Well based on our test we think it was the later and had nothing to do with the quality of work by the rigger.

So back to the boat today with heat gun in hand.  We cleaned all of the silicone that was there from a previous attempt to stop the leak, and ensured it was all gone.  We then mixed epoxy in a small syringe and injected it in the tiny crack between the toe rail and deck.  It was kind of like calking with a tip the size of a needle.  It seemed like it was working very well as it was being laid down and even seeped a little more generously into the areas that had a noticeably bigger gap.

Our Mast Head
(Anemometer, anchor light, vhf antenna and windex)
Since the rigger was going to be here, we opted to take care of several other things that were on our list to get done.  So the list is.

  • Rear Backstay replaced (had a small crimp in 1 of the 19 strands of stainless steel)
  • New VHF antenna mounted on mast head (not sure what happened to the old one, I noticed a couple of months ago that just the base was there, the antenna itself was gone)
  • New Deck light bulb installed (heck if he was going to be up there, lets get it all done)
  • Had him add an additional block at the top of the mast for a 3rd halyard (it will be nice to have a backup halyard in the event of a failure, rigging issues or even a backup line for a bosuns chair.)
  • Deb was cool and surprised me with new Halyards for the Main and Jib while he was here.  The old ones were losing their "flexibility"
  • 2 new flag halyards on each spreader for proper quarantine flag flyings, burgees, etc.
  • Lastly a complete rigging inspection (all looked good)
New Main Halyard (New England Spectra Line)

It has certainly been a productive week and will be a productive next month or so.  We will be going back in with all of the salon rebuild as soon as the chainplates are back in and the hatch is installed.  (We have to know all the leaks are taken care of before we put the wooden walls back in place).  We have also got smart about ensuring that we are building access panels to all of these as well through cabinets, walls, etc.

In the last week we have also been getting everything lined up to finalize the salon and galley refit.    We have placed our order for a new 16K BTU reverse cycle air conditioner and heater for the salon.  This in addition to the 12K BTU unit for the rear stateroom should be more than enough for our warm days when living aboard.  The great news is that as long as we don't sail in sub 40 degree water, we can use the same units to heat the boat.   It was out of stock so hoping we have it in the next few weeks.

She looks small from 50 feet up
(You can see our welcome aboard matt on the dock)
The hatch that was leaking was sent back to the manufacturer (nice to see they are still family owned and in business) and being rebuilt and having new glass installed.  Our Gulfstar has all heavy duty Atkins & Hoyle opening/reversing hatches and I spoke to Brian Atkins about doing the work.  It is currently curing and will be coming back next week.

We are also really excited about our new refrigerator/freezer unit.  When we were at a boat show last year we looked at, and really liked, the Cool Blue 12v low draw units with large holding plates.  It was pricy and our unit worked so we just made a mental note and loved the idea of only drawing 24 amps of power in a day.  When I dripped water into our cold machine circuit board, she decided not to run again.  Instead of fixing it (which would have been about 20% of the cost of new unit) we decided to just go ahead and get the best unit for living aboard.    When installed it will give us a complete freezer compartment and a separate refrigerator.  It comes with a 13" X 21" holding plate that is 2 1/2" thick.  The holding plate allows the unit to cool the fluid in that stainless still plate and hold that cold temperature much longer reducing the number of times the compressor has to cycle on and off.  We will end up modifying the opening to our top opening unit to allow better access to the side that we will make the freezer but more on that project when we install it.

Below are a few pictures from atop the mast.  I just through the view was cool so figured I would post them here on the blog as well.
Atop the mast facing North
Watergate Marina starts at the boat house
Atop the mast facing South
Legend Point Marina/Condos in view

Sunday, September 23, 2012

NOT what you want to find in the middle of the job

The work on the Salon continues and we have removed the rest of all cabinetry.  2 opening ports have been removed as has one of the hatches in the roof that was leaking.

Removing the hatch took several hours to break the aluminum frame from the rise as well as breaking the riser loose from the actual deck.  Both had to be removed to inspect the core where the leak was.  We do have softened core in a small section along the opening, it is being removed and filled with a thickened epoxy.

The deck around the openings have all been cleaned and all silicone and adhesive removed.  Acetone worked well along with some 3M pads and razor blades for removing the material.

Image loading, if you are on a slow connection, please wait a momentAll of that was going according to plan, what was not going according to plan was noticing down below that water was slowly coming in along the forward port chainplate.  (The Chainplates are what attach to the hull and then the Standing Rigging, the wire that holds up the mast, is attached to).

After further inspection, I can see that at some point in time, this chain plate had some type of service done to it.  The wooden toe rail that the chainplate goes through, has been cut and then patched back in.  (Below in the image, the blue arrows point to the spot where the toe rail had been cut to gain access to the chainplate.  The red arrows point to the spot that the water is getting into.  I noticed when pouring just a couple of ounces of water on the deck in front of that patched part of the toe rail, some of it is running in.)   I could likely just run a bead of silicone along the joint between the toe rail and the deck, but I suspect that if this has been leaking for a while, I really want to see what is going on in there where that patch is.  This is one of the benefits of having the boat down to bear hull.  I would have never seen this otherwise and in the end, it is not a lot of water coming in, but a little bit every day would cause serious damage.  Now I know why I am having to replace the wooden countertop in the Salon, I suspected a leaking port, but I don't think that is the bigger problem here.
Image loading, if you are on a slow connection, please wait a moment
The strange thing is that it was not raining, this leak became evident just from the dew that was on the deck and starting to pool along the edge of the patched part of the toe rail.  Needless to say, I will be removing the patch and inspecting this closer.  This is a delay I certainly did not anticipate.

I am starting to see why I have heard that when starting a boat project, estimate the time line and the cost accurately and realistically, then double the cost and triple the time and you will be about right for the job.  That has certainly proven to be the case in most of our ventures so far.  :)  Ahhh boat ownership.    I joke, but really wouldn't trade it for the world.