Showing posts with label Plywood. Show all posts
Showing posts with label Plywood. Show all posts

Sunday, August 25, 2013

The work moves to the V-Berth

Our plan of starting our refit inside the boat from the rear and moving forward has worked pretty well.  We are now to the V-Berth which is a pretty good sign.  This is an area that will require quite a bit of work due to leaks that were in the large opening hatch on the coachroof.  Like most things, you don't quite see how bad it is until you take out all of the molding and really start looking closely at things.

We have removed the headliner from the coachroof, and removed all of the molding carefully labeling it all with a sharpie so we can put the puzzle back together.  Sadly I broke a piece of the molding, but as this project has gone on, I have been getting better at correcting my mistakes.  One of the things we learned how to do was  make our own molding to match what is on the boat.  It takes some time and creativity but we have been able to replace it all and keep making them out of solid Teak.

Dry fitting curved Mahogany wall in place (lots of work to still be done)
We removed the opening port, cleaned all of the old bedding material off of the fiberglass both inside and out.  We removed every bit of sealant and bedding from the port as well as the decorative trim that goes on the outside.

We have made new decorative wall sections out of Mahogany plywood like it was originally.  This will cover the raw fiberglass on the inside of the coachroof.  We put a thin layer of insulation behind each panel and then start the re-assembly.  This particular piece was a bit interesting because it is curved.  We have certainly dealt with curves before but this one is not as wide so the curve it a bit tighter.

The picture is just the first step where we have just dry fit the curved piece in place.  The next step will be to bed the port later today and install the other 2 sides of the mahogany walls.

We have been putting the work in the V-berth off since we moved aboard, but we are expecting some friends to visit in a month or so and want to be sure that this room is ready for them when they arrive.

Frankly, the toughest part of this V-Berth work is going to be the fact that the forward bulkhead is rotted and is going to have to be replaced.  It's purpose is to essentially store the anchor chain and rode.  For those not familiar with it, when pulling in the anchor, the chain or line goes through an opening called a hawse-pipe and drops into this forward compartment.  It allows the topsides to stay neat and not have to find a place up there to store 200-300 feet of chain.

Sunday, June 16, 2013

Aft Head - Teak and Holly and Epoxy, Oh My !

We now have a working rear head with electric flushing head (toilet), new counter and Teak wood sink basin.  

We removed the artificial marble that was in the head for an old counter.  It was stained and not installed at the right angle and sadly after showering, the water would puddle on the countertop and not run off the front.
We pulled all of that out, repainted all of the walls with a porcelain paint to refresh all of the walls in the shower.  We also decided to make the counter out of Teak and Holly.  To do this we used 3/4" marine grade plywood with teak and holly veneer on it.  
After dry fitting the counter and vertical wall, we cut all of the holes we needed for the storage access, shower pump switch, sink drain, faucet and shower knob.  

Because this is also the shower, it was important that we consider how to avoid rot from the water.  To do this we decided to cover all of the wood in epoxy.   After mounting, we have used painters tape to protect the newly applied porcelain paint, and then did an initial coat of Epoxy.  After dry, we sanded with 220 grit sandpaper to get it very smooth.  The next step was to wipe it all down with a tack cloth and then apply another coat of epoxy.  I noticed in the first coat that by the time I was finishing up the work the epoxy was starting to get too thick to work well with.  

To combat this, I mixed smaller batches and focused on specific parts of the counter starting with the top because I wanted that to look the best of all of it.  I applied a fairly thick coat of epoxy with a chip brush on the wood, and then gently stroking in the direction of the grain to blend it all in and ensure any bubbles in the epoxy were popped.

I added the shower control and the sink faucet and then installed our favorite feature and that is the sink carved out of an actual teak log.  We bought the sink online and when installed it leaked around the drain.  We contacted the company and without much help from them other than an assurance that the movement and gaps in the drain would not be a problem (turned out it was), we did what most boat owners end up doing, we figured we could do it better.   We removed the old drain from the log, cleaned out the sealant that was used by the place we bought it from to seal the drain.  From there I carved the drain a bit deeper so that the flange of the drain actually sat lower than the lowest portion of the bottom of the sink.  I thickened some epoxy with sawdust to a peanut butter consistency and applied it in the newly carved drain seat.  After installing and letting it dry, this worked great and was no longer leaking.  I still need to anchor the sink to the counter (likely will use silicone to do that in the event I ever need to remove it I can) but will do that after the fact.

In the end, we loved how this turned out.  The epoxy coats are thick enough to protect the wood for many many years even when getting wet during showers.  The finish is so shiny that it is reflective.  In the top picture you can see the reflection of the outlets.  Now I may have to make an outlet cover out of some spare teak that I have and epoxy them so they look close to as nice as the counter.

When we finish all of the work such as hanging the mirror back up, finishing with the outlet covers and doors for the counter, I will post more pictures.

Friday, October 7, 2011

90% complete on the Owners Stateroom

Work has continued on the Owners Stateroom, and we are thrilled with the way that the ceiling planks are starting to look.  We started with a plank running up the center of the boat on the ceiling and then started to fit each plank from the center to the outer edge.  Because of the angles, it was necesaarry to install the rear ceiling trim to hold the planks in place and screw them to the ceiling joists (fancy way of describing the small wooden cross beams attached to the fiberglass).

Once we made it to the corner (in the picture above and right) it was required that every piece be cut with an angle and then fit into the tongue and groove.  A few mistakes were made when I would cut them at the wrong angle.

Once the ceiling was in place, the trim was all screwed back into place. When we disasembled the stateroom, we drew diagrams and traced the screws and then stored the legend and screws in a zip log bag so when we were assembling, we could ensure the right screws went back in the correct location (didn't want any to go all the way through and poke through the cabin top.)

After the trim was all in place and secured, the bungs were installed.  I have a cheap set of bung cutters (under $10) that I picked up from Harbor Freight and using an old scrap of teak trim, I cut 160 or so plugs/bungs.  After removing all of those bungs, we found that the best way to assemble is to NOT glue them in place but rather hold them in place with varnish so that if they ever have to be removed again, a drill bit run into the center of the plug will break the varnish free and it will pop right out.   

After a 24 hours drying period the bungs can be popped one time gently with a sharpened chisel and then sanded flat and flush with the trim.    We were in the home stretch at this point so we cleaned up the mess we had made in the stateroom and vacuumed and cleaned up all of the saw dust.  We used tack clothes to wipe everything down really good so that it was ready for a first coat of varnish.  You can see in the picture to the right just what a difference that first coat of varnish makes on what looks like a rather bland wall or piece of teak trim.  This was the excitement shot we needed because at this point we wanted to see some victories after all this work.  Seeing that shine was it.

With 3 coats of Varnish on now, it is really staring to come together.  Here are some photos in it's current state.

We couldn't be happier with the knotty pine ceiling planks.  I hope they do last and don't cause an issue over time.  We were able to install the solar vent through them and there is enough gaps in a couple of small locations to allow a little bit of air flow in there as well.


The next Blog update that we post will be photos that have the new bulkhead for the vanity seat installed and the bedding back in place.  We do still need to install lighting and have held off right now because we just haven't found the ones that we both decided are the ones we really like.
Knotty Pine Ceiling