The work moves to the V-Berth

Our plan of starting our refit inside the boat from the rear and moving forward has worked pretty well.  We are now to the V-Berth which is a pretty good sign.  This is an area that will require quite a bit of work due to leaks that were in the large opening hatch on the coachroof.  Like most things, you don't quite see how bad it is until you take out all of the molding and really start looking closely at things.

We have removed the headliner from the coachroof, and removed all of the molding carefully labeling it all with a sharpie so we can put the puzzle back together.  Sadly I broke a piece of the molding, but as this project has gone on, I have been getting better at correcting my mistakes.  One of the things we learned how to do was  make our own molding to match what is on the boat.  It takes some time and creativity but we have been able to replace it all and keep making them out of solid Teak.

Dry fitting curved Mahogany wall in place (lots of work to still be done)
We removed the opening port, cleaned all of the old bedding material off of the fiberglass both inside and out.  We removed every bit of sealant and bedding from the port as well as the decorative trim that goes on the outside.

We have made new decorative wall sections out of Mahogany plywood like it was originally.  This will cover the raw fiberglass on the inside of the coachroof.  We put a thin layer of insulation behind each panel and then start the re-assembly.  This particular piece was a bit interesting because it is curved.  We have certainly dealt with curves before but this one is not as wide so the curve it a bit tighter.

The picture is just the first step where we have just dry fit the curved piece in place.  The next step will be to bed the port later today and install the other 2 sides of the mahogany walls.

We have been putting the work in the V-berth off since we moved aboard, but we are expecting some friends to visit in a month or so and want to be sure that this room is ready for them when they arrive.

Frankly, the toughest part of this V-Berth work is going to be the fact that the forward bulkhead is rotted and is going to have to be replaced.  It's purpose is to essentially store the anchor chain and rode.  For those not familiar with it, when pulling in the anchor, the chain or line goes through an opening called a hawse-pipe and drops into this forward compartment.  It allows the topsides to stay neat and not have to find a place up there to store 200-300 feet of chain.

Friday, October 7, 2011

90% complete on the Owners Stateroom

Work has continued on the Owners Stateroom, and we are thrilled with the way that the ceiling planks are starting to look.  We started with a plank running up the center of the boat on the ceiling and then started to fit each plank from the center to the outer edge.  Because of the angles, it was necesaarry to install the rear ceiling trim to hold the planks in place and screw them to the ceiling joists (fancy way of describing the small wooden cross beams attached to the fiberglass).

Once we made it to the corner (in the picture above and right) it was required that every piece be cut with an angle and then fit into the tongue and groove.  A few mistakes were made when I would cut them at the wrong angle.

Once the ceiling was in place, the trim was all screwed back into place. When we disasembled the stateroom, we drew diagrams and traced the screws and then stored the legend and screws in a zip log bag so when we were assembling, we could ensure the right screws went back in the correct location (didn't want any to go all the way through and poke through the cabin top.)

After the trim was all in place and secured, the bungs were installed.  I have a cheap set of bung cutters (under $10) that I picked up from Harbor Freight and using an old scrap of teak trim, I cut 160 or so plugs/bungs.  After removing all of those bungs, we found that the best way to assemble is to NOT glue them in place but rather hold them in place with varnish so that if they ever have to be removed again, a drill bit run into the center of the plug will break the varnish free and it will pop right out.   

After a 24 hours drying period the bungs can be popped one time gently with a sharpened chisel and then sanded flat and flush with the trim.    We were in the home stretch at this point so we cleaned up the mess we had made in the stateroom and vacuumed and cleaned up all of the saw dust.  We used tack clothes to wipe everything down really good so that it was ready for a first coat of varnish.  You can see in the picture to the right just what a difference that first coat of varnish makes on what looks like a rather bland wall or piece of teak trim.  This was the excitement shot we needed because at this point we wanted to see some victories after all this work.  Seeing that shine was it.

With 3 coats of Varnish on now, it is really staring to come together.  Here are some photos in it's current state.

We couldn't be happier with the knotty pine ceiling planks.  I hope they do last and don't cause an issue over time.  We were able to install the solar vent through them and there is enough gaps in a couple of small locations to allow a little bit of air flow in there as well.


The next Blog update that we post will be photos that have the new bulkhead for the vanity seat installed and the bedding back in place.  We do still need to install lighting and have held off right now because we just haven't found the ones that we both decided are the ones we really like.
Knotty Pine Ceiling